Test for Executive Staff of the Kerala State Electricity Board Paper 3
Choose the correct answer from the following options
1. This of the following is not a function of the Regional Load Despatch Centre :
A Optimum scheduling and despatch of electricity
B Monitor grid operations
C Carry out real time operations of the grid control and despatch of electricity
D Supervision and control over the intra-State transmission system